[ Tips ] 一分鐘使用導覽
商品編號: 9-913-525 出版日期: 2012/09/28 作者姓名: Bruns, William J., Jr.;Hertenstein, Julie H.;Liu, Kelvin 商品類別: Other 商品規格: 5p 再版日期: 地域: 產業: 個案年度: 2012 -
商品敘述:
Danshui Plant No. 2 in southern China has a one-year contract with Apple Inc. to assemble 2.4 million iPhones. In the first three months of the contract, the plant is unable to assemble as many phones as expected and is operating at a loss. The plant manager must analyze the budget and prepare a summary of monthly operations to help identify the source of performance problems. The plant has had difficulty hiring enough workers despite raising wages over 30%. In addition, the assembly process for an iPhone is complicated, with 140 steps involving over 100 components. The plant manager considers whether a flexible budget would be more useful for uncovering problems than the static budget currently being used. Students must perform break-even and flexible budget analyses and calculate price and usage variances as they consider solutions for the plant''s problems with the iPhone contract. This case, which explores the challenges of outsourcing manufacturing, can be used as an introduction to managerial accounting.
涵蓋領域:
Breakeven analysis;Budgets and budgeting;Management accounting;Cost analysis;Outsourcing;Production
相關資料:
, (9-913-526), 10p, by William J. Bruns, Julie H. Hertenstein, Kelvin Liu
哪些人也有訂購?